Saturday, June 23, 2012

Interior Changes

Bathtub/Shower (by the guest room)

In the kitchen looking out

Looking at the kitchen, the bar/counter is framed up

Tub in master bathroom

Siding!


Saturday, June 16, 2012

Exterior Progress

Here's the progress on the house so far:
March 29:



April 17:
May 8:


May 9:





May 20:
May 29:
June 2:


  
June 5:

June 10:

June 16:

June 21:

June 24:

July 8:

July 11:

July 14:

July 18:



Sunday, June 10, 2012

Inside in Progress

Inside garage, looking at the house (kitchen, hallway, laundry room, bedroom)

In garage, looking outside

In entryway to kitchen, looking at the kitchen/great room. (The pipe sticking up is where the kitchen sink will be.)

In guest bedroom, looking at kitchen.

Kitchen/eating area

Kitchen, from eating area
  
Stairs, just off kitchen

Formal dining room


Master bedroom

Master bedroom

Master suite, from bedroom looking at closets and bathroom

Going up the stairs


Looking at great room (and master suite) from upstairs

Bonus Room

Upstairs bathroom

Upstairs bedroom 1

Upstairs bedroom 2